Design Reconciliation and Harmonization

a. Access Road: The intersection at Access Road between JICA flyover, the meter gauge railway and the standard gauge railway harmonized after discussions with all the stakeholders including KCCA, UNRA, etc. The flyover was elevated higher and the SGR will have a separate grade crossing. b. SGR and Jinja Kampala Express Way (JKEW): To avoid a lot of intersections between the JKEW and the SGR that would require harmonizing the levels and angles of approach, the JKEW is being re-aligned to run along the SGR and UNRA has taken this positive initiative for the sake of harmonizing infrastructure along the corridor. c. SGR and Electricity: The Project is working with UETCL to ensure that future constructions and designs are harmonized with the SGR. d. SGR and DUCAR Roads: SGR is harmonizing with all the district authorities to provide access through the SGR since SGR will be elevated all the way from Malaba to Kampala. Pic: Artistic impression of harmonized SGR, Kampala Fly Over & current Meter Gauge Railway at Access Road. Kampala Fly Over will be above SGR.

CONNECT WITH US

Standard Gauge Railway Uganda
Developing the Tororo-Kampala (Eastern) and Tororo -Amuru-Packwach (Northern) routes