What are some of the design and operation features that make the SGR different/unique?

Thu, 02/06/2025 - 12:42 -- admin

• Each passenger train will carry 960 passengers.
• Each freight train will carry 4,000 gross tonnes.
• The trains will move at speeds of 100Kph and 120kph for freight and passengers respectively.
• The trains will be electric. Therefore, no noise, more comfort and eco-friendly.
• Travel time from Mombasa to Kampala will be one day

CONNECT WITH US

Standard Gauge Railway Uganda
Developing the Tororo-Kampala (Eastern) and Tororo -Amuru-Packwach (Northern) routes