The project is using the MGR corridor land as much as possible. However, to achieve the desired speed, the SGR design diverts from the MGR into new right of way in some arears.
CONNECT WITH US
Standard Gauge Railway Uganda
Developing the Tororo-Kampala (Eastern) and Tororo -Amuru-Packwach (Northern) routes